- OPERATION NAME: Mahoney
- SUBMIT DATE: 03-17-2019
- NOAP ID: 2019-712-03698
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: GRANTS PASS
Grants Pass, Oregon, 97526
ODF FORESTER
Notifier
JAMES DOUGHERTY
- COMPANY:
- Inland Timber Co
- ADDRESS:
- PO Box 95
Cave Junction, Oregon, 97523 - PHONE:
- (541) 592-4982
- EMAIL:
- Not Available
Landowner(s)
JULIE MAHONEY
- ADDRESS:
- PO Box 190780
Hawi, Hawaii, 96719 - PHONE:
- (541) 415-0242
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
JAMES DOUGHERTY
- COMPANY:
- Inland Timber Co
- ADDRESS:
- PO Box 95
Cave Junction, Oregon, 97523 - PHONE:
- (541) 592-4982
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- James Dougherty
- PHONE:
- (541) 415-0242
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Commercial Thinning/Selective Cutting
- METHOD(S):
- Ground
- OPERATOR:
- James Dougherty
- COMPANY:
- Inland Timber Co
This Unit falls within the following Regulated Use Areas: SW-3
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- Wetlands: Freshwater Pond
- None detected.
Site Conditions
- Slope of steepest 1/3 area: 30 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Doug Thackery
8/15/2019 8:11:19 AM
HERE ARE MY REVIEW COMMENTS ON YOUR WRITTEN PLAN OREGON DEPARTMENT OF FORESTRY Operator: Inland Timber Co. Landowner: Julie Mahoney Notification and Unit #: 2019-712-03698 Operation Name or Vicinity: Mahoney This information and advice is intended to assist you in complying with Oregon forest resource protection regulations. STATUTORY WRITTEN PLAN Regarding the attached Statutory Written Plan for Commercial Thinning/Selective Cutting activities described in notification 2019-712-03698 within 100’ of a Type F stream. Stream Stream Name: Chokecherry Creek Stream Classification: Small Type F Statutory Written Plan required by: ORS 527.670(3)(a) and OAR 629-605-0170(2) for an operation within 100 feet of a Type F or Type D stream. I have the following comments and recommendations. Fully implementing this written plan is likely to achieve the resource protection standards. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved. All operations will need to be conducted within the in-stream work period (June 15 – September 15) to minimize impact of operation on fish. Plan Receipt Date: 7/31/2019 Review / Comments Date: 8/15/2019 Reviewing Stewardship Forester: Doug Thackery Office Phone: 541-474-3152 Mobile Phone: 541-761-9690 Email: Douglas.v.thackery@oregon.gov
-
Doug Thackery
7/30/2019 3:02:32 PM
HERE ARE MY REVIEW COMMENTS ON YOUR WRITTEN PLAN OREGON DEPARTMENT OF FORESTRY Operator: Inland Timber Co. Landowner: Julie Mahoney Notification and Unit #: 2019-712-03698 Operation Name or Vicinity: Mahoney This information and advice is intended to assist you in complying with Oregon forest resource protection regulations. STATUTORY WRITTEN PLAN Regarding the attached Statutory Written Plan for Commercial Thinning/Selective Cutting activities described in notification 2019-712-03698 within 100’ of a Type F stream. Stream Stream Name: Chokecherry Creek Stream Classification: Small Type F Statutory Written Plan required by: ORS 527.670(3)(a) and OAR 629-605-0170(2) for an operation within 100 feet of a Type F or Type D stream. I have the following comments and recommendations. • This document is incomplete because it does not include all of the elements required in a written plan by OAR 629-605-170(12) and (13). You need to submit a new or revised plan that describes the protected resources in your operation area and the methods you will use to protect those resources. The 14-day review period has not officially started. The elements you need to include in the written plan to make it complete are as follows. 1) Details regarding measures to make the crossings usable prior to hauling. 2) Details on resource protection during the operation. 3) Details on post operation rehabilitation and repair to prevent damage to the stream and water quality. Plan Receipt Date: 7/16/2019 Review / Comments Date: 7/30/2019 Reviewing Stewardship Forester: Doug Thackery Office Phone: 541-474-3152 Mobile Phone: 541-761-9690 Email: Douglas.v.thackery@oregon.gov
-
Doug Thackery
7/16/2019 10:27:11 AM
Correction - Operator emailed statutory written plan on 7/15.
-
Doug Thackery
7/16/2019 10:26:29 AM
Operator emailed a statutory map on 7/15 and the required map on 7/16. Uploaded to FERNS document tab on 7/16.
-
Doug Thackery
3/18/2019 10:37:51 AM
1) Choke Cherry Creek is a Small Type F (fish-bearing) stream, no operations within 100' without a reviewed statutory written plan on file. 2) No conflict with other protected resources. 3) If this is a conversion to a land use not compatible with forest tree cover, a required Plan for Alternate Practice and plan approval is needed before harvesting. If you have questions contact Doug Thackery at 541-471-2856. 4) Request to waive 15-day waiting period is granted.
Notifier Comment