• OPERATION NAME: Ragsdale Butte
  • SUBMIT DATE: 09-05-2018
  • NOAP ID: 2018-711-12257
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)

Oregon Department of Forestry Contact Information

ODF OFFICE: MEDFORD
ODF DISTRICT:
Southwest Oregon
ADDRESS:
5286 Table Rock Rd
Central Point, Oregon, 97502
PHONE:
(541) 664-3328
ODF FORESTER
NAME:
Steve Wetmore

Notifier

RANDY ZUSTIAK
ADDRESS:
Oregon
PHONE:
Not Available
EMAIL:
Not Available

Notifier Comment

No Notifier comments have been made on this NOAP.

Landowner(s)

Landowner Responsibility
TIM VREDENBURG
COMPANY:
Cow Creek Band of Umpqua Tribe of Indians
ADDRESS:
2371 NE Stephens Street, Suite 100
Roseburg, Oregon, 97470
PHONE:
(541) 672-9405
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
RANDY ZUSTIAK
COMPANY:
Murphy Company
ADDRESS:
7975 11th Street
White City, Oregon, 97503
PHONE:
(541) 830-7007
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Brian Scallon
PHONE:
(541) 778-4492

Units / Activities / Operators

  • Road Reconstruction

    METHOD(S):
    Excavator, Dozer
    OPERATOR:
    Brian Scallon
    COMPANY:
    Brothers Excavation and Construction LLC

This Unit falls within the following Regulated Use Areas: SW-2

Site Conditions

RESOURCES THAT MAY REQUIRE A WRITTEN PLAN
  • Stream within 100 feet of area.
ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 25 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Steve Wetmore
    9/11/2018 2:43:29 PM
    1) All streams are Small Non, instream work period is extended through SEP 30 due to low/no water conditions 2) All crossings must be designed for 50-year peak flow and must be bankful width 3) temporary crossings must be removed by SEP 30 4) Must meet all fire prevention requirements for the current IFPL 5) Waiver of the 15-day waiting period is granted