- OPERATION NAME: Ragsdale Butte
- SUBMIT DATE: 09-05-2018
- NOAP ID: 2018-711-12257
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: MEDFORD
Central Point, Oregon, 97502
ODF FORESTER
Notifier
RANDY ZUSTIAK
- ADDRESS:
- Oregon
- PHONE:
- Not Available
- EMAIL:
- Not Available
Landowner(s)
TIM VREDENBURG
- COMPANY:
- Cow Creek Band of Umpqua Tribe of Indians
- ADDRESS:
- 2371 NE Stephens Street, Suite 100
Roseburg, Oregon, 97470 - PHONE:
- (541) 672-9405
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
RANDY ZUSTIAK
- COMPANY:
- Murphy Company
- ADDRESS:
- 7975 11th Street
White City, Oregon, 97503 - PHONE:
- (541) 830-7007
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Brian Scallon
- PHONE:
- (541) 778-4492
Units / Activities / Operators
-
Road Reconstruction
- METHOD(S):
- Excavator, Dozer
- OPERATOR:
- Brian Scallon
- COMPANY:
- Brothers Excavation and Construction LLC
This Unit falls within the following Regulated Use Areas: SW-2
Site Conditions
- Stream within 100 feet of area.
- Slope of steepest 1/3 area: 25 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Steve Wetmore
9/11/2018 2:43:29 PM
1) All streams are Small Non, instream work period is extended through SEP 30 due to low/no water conditions 2) All crossings must be designed for 50-year peak flow and must be bankful width 3) temporary crossings must be removed by SEP 30 4) Must meet all fire prevention requirements for the current IFPL 5) Waiver of the 15-day waiting period is granted
Notifier Comment