- OPERATION NAME: Harris 2018
- SUBMIT DATE: 04-25-2018
- NOAP ID: 2018-772-06189
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
- Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.
Oregon Department of Forestry Contact Information
ODF OFFICE: SWEET HOME
Sweet Home, Oregon, 97386
ODF FORESTER
Notifier
FRED WARTH
- COMPANY:
- Fred Warth Contracting
- ADDRESS:
- 47650 Santiam Hwy
Foster, Oregon, 97345 - PHONE:
- (541) 367-8475
- EMAIL:
- Not Available
Landowner(s)
GENE HARRIS
- ADDRESS:
- 26600 Harris Rd
Foster, Oregon, 97345 - PHONE:
- (541) 367-6108
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
GENE HARRIS
- ADDRESS:
- 26600 Harris Rd
Foster, Oregon, 97345 - PHONE:
- (541) 367-6108
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Fred Warth
- PHONE:
- (541) 367-8475
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Commercial Thinning/Selective Cutting
- METHOD(S):
- Ground
- OPERATOR:
- Fred Warth
- COMPANY:
- Fred Warth Contracting
-
Treatment of Slash
- METHOD(S):
- Mechanical, Burning - piles
- OPERATOR:
- Fred Warth
- COMPANY:
- Fred Warth Contracting
This Unit falls within the following Regulated Use Areas: LN-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- GB Heron
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Fred Warth
- COMPANY:
- Fred Warth Contracting
-
Treatment of Slash
- METHOD(S):
- Mechanical, Burning - piles
- OPERATOR:
- Fred Warth
- COMPANY:
- Fred Warth Contracting
This Unit falls within the following Regulated Use Areas: LN-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- GB Heron
Site Conditions
- Seep or spring within 100 feet of area.
- Slope of steepest 1/3 area: 10 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Jerrin Robbins
4/27/2018 11:05:38 AM
Waiver of 15 day waiting period granted.
-
Jerrin Robbins
4/25/2018 2:11:43 PM
Northern unit has small nonfish stream identified, ensure protection to bed and banks of stream. Wildlife leave trees will need to be retained on ownership as harvest reaches over 25 acres within ownership. Reforestation will be required for clear cut harvest and for thinning if less than 80 sq ft of basil area remain on thinning unit.
-
Jerrin Robbins
4/25/2018 2:07:48 PM
Edited Northern harvest polygon to stay on Harris ownership.
Notifier Comment