• OPERATION NAME: Harris 2018
  • SUBMIT DATE: 04-25-2018
  • NOAP ID: 2018-772-06189
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
  • Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.

Oregon Department of Forestry Contact Information

ODF OFFICE: SWEET HOME
ODF DISTRICT:
South Cascade
ADDRESS:
4690 Hwy 20
Sweet Home, Oregon, 97386
PHONE:
(541) 367-6108
ODF FORESTER
NAME:
Jerrin Robbins

Notifier

FRED WARTH
COMPANY:
Fred Warth Contracting
ADDRESS:
47650 Santiam Hwy
Foster, Oregon, 97345
PHONE:
(541) 367-8475
EMAIL:
Not Available

Notifier Comment

Unit 1 is a heavy thin unit with machine pile for fall burning. Unit 2 is a clearcut with machine pile for fall burning. There are a couple of wintertime run offs seeps/springs in unit 2 that are there only during the wet seasons. We request a waiver of the 15 day waiting period. Thank you!

Landowner(s)

Landowner Responsibility
GENE HARRIS
ADDRESS:
26600 Harris Rd
Foster, Oregon, 97345
PHONE:
(541) 367-6108
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
GENE HARRIS
ADDRESS:
26600 Harris Rd
Foster, Oregon, 97345
PHONE:
(541) 367-6108
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Fred Warth
PHONE:
(541) 367-8475

Units / Activities / Operators

  • Commercial Thinning/Selective Cutting

    METHOD(S):
    Ground
    OPERATOR:
    Fred Warth
    COMPANY:
    Fred Warth Contracting
  • Treatment of Slash

    METHOD(S):
    Mechanical, Burning - piles
    OPERATOR:
    Fred Warth
    COMPANY:
    Fred Warth Contracting

This Unit falls within the following Regulated Use Areas: LN-1

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • No streams or wetlands detected.
300 Feet of
  • GB Heron
  • Clearcut/Overstory Removal

    METHOD(S):
    Ground
    OPERATOR:
    Fred Warth
    COMPANY:
    Fred Warth Contracting
  • Treatment of Slash

    METHOD(S):
    Mechanical, Burning - piles
    OPERATOR:
    Fred Warth
    COMPANY:
    Fred Warth Contracting

This Unit falls within the following Regulated Use Areas: LN-1

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • No streams or wetlands detected.
300 Feet of
  • GB Heron

Site Conditions

RESOURCES THAT MAY REQUIRE A WRITTEN PLAN
  • Seep or spring within 100 feet of area.
ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 10 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Jerrin Robbins
    4/27/2018 11:05:38 AM
    Waiver of 15 day waiting period granted.
  • Jerrin Robbins
    4/25/2018 2:11:43 PM
    Northern unit has small nonfish stream identified, ensure protection to bed and banks of stream. Wildlife leave trees will need to be retained on ownership as harvest reaches over 25 acres within ownership. Reforestation will be required for clear cut harvest and for thinning if less than 80 sq ft of basil area remain on thinning unit.
  • Jerrin Robbins
    4/25/2018 2:07:48 PM
    Edited Northern harvest polygon to stay on Harris ownership.