- OPERATION NAME: Walker Complex
- SUBMIT DATE: 03-04-2018
- NOAP ID: 2018-712-03715 (c)
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
NOAP CONTINUATIONS
-
Issued on: 12-19-2018Expires on: 12-31-2019Continuation issued by Doug Thackery
Oregon Department of Forestry Contact Information
ODF OFFICE: GRANTS PASS
Grants Pass, Oregon, 97526
ODF FORESTER
Notifier
GREG E LILES
- COMPANY:
- Greg Liles Logging
- ADDRESS:
- 4580 Crater Lake Ave
Medford, Oregon, 97504 - PHONE:
- (541) 821-5153
- EMAIL:
- Not Available
Landowner(s)
DAVE STREETER
- COMPANY:
- Josephine County Forestry
- ADDRESS:
- 500 N.W. 6th St., Dept. 8
Grants Pass, Oregon, 97526 - PHONE:
- (541) 474-5291
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
GREG E LILES
- COMPANY:
- Greg Liles Logging
- ADDRESS:
- 4580 Crater Lake Ave
Medford, Oregon, 97504 - PHONE:
- (541) 821-5153
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Gregory Liles
- PHONE:
- (541) 821-5153
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Commercial Thinning/Selective Cutting
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Greg E Liles
- COMPANY:
- Greg Liles Logging
This Unit falls within the following Regulated Use Areas: SW-3
-
Commercial Thinning/Selective Cutting
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Greg E Liles
- COMPANY:
- Greg Liles Logging
This Unit falls within the following Regulated Use Areas: SW-3
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- NS Owl
-
Commercial Thinning/Selective Cutting
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Greg E Liles
- COMPANY:
- Greg Liles Logging
This Unit falls within the following Regulated Use Areas: SW-3
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- NS Owl
Site Conditions
There are no known site conditions associated with this NOAP.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Doug Thackery
12/19/2018 2:05:00 PM
Continued for 2019
-
Doug Thackery
3/5/2018 10:05:37 AM
1) Walker & Orofino unit Tributaries to Cove creek are Small Nonfish, no instream work to include crossing until low water conditions have been approved by ODF & HLHL does not meet further review criteria 2) Jump Off Joe meets HLHL further review criteria, but field visit in 2015 determined open slope and residence is 50-100 above the level of the stream No further review required
Notifier Comment