• OPERATION NAME: East Laurel
  • SUBMIT DATE: 01-03-2018
  • NOAP ID: 2018-552-00298 (c)
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
  • Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.

NOAP CONTINUATIONS

  • Issued on: 01-02-2019
    Expires on: 12-31-2019
    Continuation issued by Dave Thompson

Oregon Department of Forestry Contact Information

ODF OFFICE: DALLAS
ODF DISTRICT:
West Oregon
ADDRESS:
825 Oak Villa Rd
Dallas, Oregon, 97338
PHONE:
503-934-8146
ODF FORESTER
NAME:
Dave Thompson

Notifier

MYCHAL WESTENDORF
COMPANY:
Miller Timber Services
ADDRESS:
PO Box 638
Philomath, Oregon, 97370
PHONE:
(541) 609-2544
EMAIL:
Not Available

Notifier Comment

No Notifier comments have been made on this NOAP.

Landowner(s)

Landowner Responsibility
WYTHI DALLAS
COMPANY:
Weyerhaeuser Timber Holdings, Inc.
ADDRESS:
900 SE Monmouth Cutoff Road
Dallas, Oregon, 97338
PHONE:
(503) 623-7142
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
WYNR DALLAS
COMPANY:
Weyerhaeuser NR
ADDRESS:
PO Box 488
Dallas, Oregon, 97338
PHONE:
(503) 623-7142
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Andy Weathers
PHONE:
(503) 509-9049

Units / Activities / Operators

32.3 ACRES
  • Clearcut/Overstory Removal

    METHOD(S):
    Cable, Ground
    OPERATOR:
    WYNR Dallas
    COMPANY:
    Weyerhaeuser NR
  • Treatment of Slash

    METHOD(S):
    Manual, Mechanical, Burning - piles
    OPERATOR:
    WYTHI Dallas
    COMPANY:
    Weyerhaeuser Timber Holdings, Inc.

This Unit falls within the following Regulated Use Areas: WO-1

Site Conditions

ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 65 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Dave Thompson
    1/2/2019 2:41:49 PM
    This NOAP has been continued for 2019 as per the Landowner’s request.
  • Dave Thompson
    10/5/2018 2:03:58 PM
    Uploaded the approved plan for alternate practice
  • Dave Thompson
    1/8/2018 9:53:47 AM
    Tethered Logging Practices – There are areas of High Landslide Hazard Locations identified within the boundaries of this timber harvest. No ground-based machine activity may occur on High Landslide Hazard Location slopes prior to having an approved Plan for Alternate Practice. Please contact the Stewardship Forester for more information.
  • Dave Thompson
    1/8/2018 9:44:09 AM
    Rickline WyCo (74 acres, harvested 2016) appears to border this unit to the west, and North Laurel (66 acres, harvested 2017) appears to border this unit to the north. If these three units are contiguous, the total acreage under the reforestation requirement would be 172 acres, which would be in violation of ORS 527.740, harvest type 3 limitations of 120 contiguous aces. Landowner needs to ensure there is adequate separation (minimum of 300 feet) between at least one of these units so there is no more than 120 contiguous acres of harvest type 3 conditions resulting from this harvest.