- OPERATION NAME: Pacific Rim Associates
- SUBMIT DATE: 06-13-2017
- NOAP ID: 2017-740-07607
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: COOS BAY
Coos Bay, Oregon, 97420
ODF FORESTER
Notifier
BRET O'BRIEN
- COMPANY:
- Pacific Rim Associates LLC
- ADDRESS:
- P. O. Box 395
Port Orford, Oregon, 97465 - PHONE:
- (541) 290-3999
- EMAIL:
- Not Available
Landowner(s)
PUHL FAMILY, TRUST MARY ANN PUHL, TRUSTEE
- COMPANY:
- Puhl Family Trust
- ADDRESS:
- PO Box 807
Port Orford, Oregon, 97465 - PHONE:
- (541) 348-2320
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
PUHL FAMILY, TRUST MARY ANN PUHL, TRUSTEE
- COMPANY:
- Puhl Family Trust
- ADDRESS:
- PO Box 807
Port Orford, Oregon, 97465 - PHONE:
- (541) 348-2320
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Ron Puhl
- PHONE:
- (541) 253-7567
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Bret O'Brien
- COMPANY:
- Pacific Rim Associates LLC
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Bret O'Brien
- COMPANY:
- Pacific Rim Associates LLC
This Unit falls within the following Regulated Use Areas: CS-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Bret O'Brien
- COMPANY:
- Pacific Rim Associates LLC
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Bret O'Brien
- COMPANY:
- Pacific Rim Associates LLC
This Unit falls within the following Regulated Use Areas: CS-1
Site Conditions
There are no known site conditions associated with this NOAP.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Stacy Savona
6/16/2017 10:51:28 AM
Written plan required for operations within 100' of the Elk tributaries that are fish bearing. Scenic Highway Corridor extends 150' from the highways edge. Reforestation will be required on operations that reduce stocking below the standards set forth is Division 610 of the Forest Practices Rules.
Notifier Comment