- OPERATION NAME: J Booth
- SUBMIT DATE: 03-03-2017
- NOAP ID: 2017-531-02757
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: FOREST GROVE
Forest Grove, Oregon, 97116
ODF FORESTER
Notifier
MIKE PORTER
- COMPANY:
- A-1 Logging Inc.
- ADDRESS:
- P.O. Box 667
Yamhill, Oregon, 97148 - PHONE:
- (503) 502-6285
- EMAIL:
- Not Available
Landowner(s)
JAMES BOOTH
- ADDRESS:
- 3496 Torrey Pine Drive S
Salem, Oregon, 97302 - PHONE:
- (503) 363-8718
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
JAMES BOOTH
- ADDRESS:
- 3496 Torrey Pine Drive S
Salem, Oregon, 97302 - PHONE:
- (503) 363-8718
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Mike Porter
- PHONE:
- (503) 502-6285
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Mike Porter
- COMPANY:
- A-1 Logging Inc.
-
Treatment of Slash
- METHOD(S):
- Mechanical
- OPERATOR:
- Mike Porter
- COMPANY:
- A-1 Logging Inc.
This Unit falls within the following Regulated Use Areas: WV-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
-
Road Reconstruction
- METHOD(S):
- Excavator, Dozer
- OPERATOR:
- Mike Porter
- COMPANY:
- A-1 Logging Inc.
This Unit falls within the following Regulated Use Areas: WV-1
Site Conditions
- Slope of steepest 1/3 area: 15 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Kevin Nelson
3/6/2017 11:51:52 AM
Waiver of waiting period granted.
-
Kevin Nelson
3/6/2017 11:11:24 AM
Reviewed by Stewardship Forester K. Nelson 03/06/17. No additional resource concerns at this time.
Notifier Comment