- OPERATION NAME: Floras Forks
- SUBMIT DATE: 02-13-2017
- NOAP ID: 2017-740-02076
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
- Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.
Oregon Department of Forestry Contact Information
ODF OFFICE: COOS BAY
Coos Bay, Oregon, 97420
ODF FORESTER
Notifier
CAMPBELL GLOBAL
- COMPANY:
- Campbell Global
- ADDRESS:
- PO Box 750
Coos Bay, Oregon, 97420 - PHONE:
- (541) 266-0177
- EMAIL:
- Not Available
Landowner(s)
PACIFIC WEST TIMBER COMPANY (OREGON), LLC
- ADDRESS:
- P.O. Box 750
Coos Bay, Oregon, 97420 - PHONE:
- (547) 266-0177
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
PACIFIC WEST LOGCO, LLC
- ADDRESS:
- P.O. Box 750
Coos Bay, Oregon, 97420 - PHONE:
- (541) 266-0177
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Erik Culley
- PHONE:
- (541) 670-7721
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Dick Clarkson
- COMPANY:
- Denali Logging Co., LLC
-
Treatment of Slash
- METHOD(S):
- Burning - piles, Broadcast burning
- OPERATOR:
- Pacific West Logco, LLC
This Unit falls within the following Regulated Use Areas: CS-2
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
Site Conditions
- Stream within 100 feet of area.
- Slope of steepest 1/3 area: 40 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Bev Quackenbush
7/17/2017 12:40:23 PM
Change of operator submitted by Erik Culley - see attached document.
-
Shannon VanDeventer
3/13/2017 10:44:56 AM
Statutory Written Plan required for an operation within 100 feet of a Type F or Type D stream: After reviewing your written plan, I offer you the following comments. Fully implementing this written plan is likely to achieve the resource protection standards. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
-
Shannon VanDeventer
2/23/2017 2:10:16 PM
Written plan and map received and uploaded (2/23/2017). The comment period is now in effect.
-
Shannon VanDeventer
2/14/2017 4:28:45 PM
This operation appears to be within 100β of the South Fork of Floras Creek (M-L/F) and two tributaries to the South Fork of Floras Creek (M/F & S/F) which are required to be protected. Written plans are required to address protection measures needed for any operation which takes place within 100β of a Type F or D stream. The required written plan was NOT received with the notification. After the Department receives the plan, it is subject to a 14-day comment period. The operation addressed in the plan may not begin until comments are provided by the SF or the additional 7-day comment period has ended (21 days total). Any sub-contractors must be notified of the provisions in the written plan.
Notifier Comment