- OPERATION NAME: Brick House
- SUBMIT DATE: 02-01-2017
- NOAP ID: 2017-531-01644 (c)
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
- Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.
NOAP CONTINUATIONS
-
Issued on: 12-27-2017Expires on: 12-31-2018Continuation issued by Kevin Nelson
Oregon Department of Forestry Contact Information
ODF OFFICE: FOREST GROVE
Forest Grove, Oregon, 97116
ODF FORESTER
Notifier
BRIAN RUPP
- COMPANY:
- PLS International
- ADDRESS:
- PO Box 1306
Longview, Washington, 98632 - PHONE:
- (360) 790-7766
- EMAIL:
- Not Available
Landowner(s)
MIKE HOWELL
- COMPANY:
- Howell Tree Farm
- ADDRESS:
- 51075 NW Cox Road
Forest Grove, Oregon, 97116 - PHONE:
- (503) 357-2882
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
BRIAN RUPP
- COMPANY:
- PLS International
- ADDRESS:
- PO Box 1306
Longview, Washington, 98632 - PHONE:
- (360) 790-7766
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Brian Rupp
- PHONE:
- (360) 790-7766
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
WARNING!
Pesticide users must follow all pesticide product label requirements, including any that prohibit applications near or into streams or other water bodies! Pesticide users must be sure the label that comes with the pesticide product allows the planned use!
Contact the Oregon Department of Agriculture here or at 503-986-4635 for information on allowed uses of pesticide products.
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Dave Dober
- COMPANY:
- Dave Dober Construction
-
Herbicide Application (Unit)
- METHOD(S):
- Ground - Pressurized / Broadcast
- OPERATOR:
- Joseph Kuznetsov
- CHEMICALS:
- Oust Extra, Transline, glyphosate, imazapyr
- CARRIERS:
- water
- ADDITIVES:
- Crop Oil Concentrate
-
Treatment of Slash
- METHOD(S):
- Burning - piles
- OPERATOR:
- Mike Howell
- COMPANY:
- Howell Tree Farm
This Unit falls within the following Regulated Use Areas: NW-3, WV-1
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Dave Dober
- COMPANY:
- Dave Dober Construction
-
Herbicide Application (Unit)
- METHOD(S):
- Ground - Pressurized / Broadcast
- OPERATOR:
- Joseph Kuznetsov
- CHEMICALS:
- Oust Extra, Transline, glyphosate, imazapyr
- CARRIERS:
- water
- ADDITIVES:
- Crop Oil Concentrate
-
Treatment of Slash
- METHOD(S):
- Burning - piles
- OPERATOR:
- Mike Howell
- COMPANY:
- Howell Tree Farm
This Unit falls within the following Regulated Use Areas: NW-3, WV-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Dave Dober
- COMPANY:
- Dave Dober Construction
-
Treatment of Slash
- METHOD(S):
- Burning - piles
- OPERATOR:
- Mike Howell
- COMPANY:
- Howell Tree Farm
This Unit falls within the following Regulated Use Areas: NW-3
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
Site Conditions
- Stream within 100 feet of area.
- Slope of steepest 1/3 area: 50 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Kevin Nelson
9/6/2018 3:15:23 PM
Contact ODF smoke management and burn permit info @ 503-359-7499 for burning instructions.
-
Kevin Nelson
5/3/2018 12:44:48 PM
expanded harvest boundary for unit 1 per landowners request 5/02/2018-K.McLaughlin
-
Kevin Nelson
12/27/2017 2:21:24 PM
Operations continued into 2018.
-
Kevin Nelson
7/3/2017 11:53:22 AM
Plan for alternate practice approved for removal of large BLM tree next to bridge. Removal of tree is for hazard reduction, and to allow for passage of log loads across bridge. Removing this tree will prevent the need for future fording of the stream with equipment.
-
Brent O'Nion
6/27/2017 2:11:32 PM
Discussed and approved the use of an existing (farm) low water crossing (ford) located downstream of the Howell bridge. The in-stream work period is June 1 - September 30. The use of the ford will consist of 3 pieces of heavy equipment for 2 crossings (over & back) during the in-stream work period only. Per phone call with DJ Dober this day. Thank you!
-
Kevin Nelson
2/2/2017 4:30:55 PM
Road drainage problems need to be addressed if hauling is to take place during wet weather operations. Stream crossings must follow temporary stream crossing requirements.
-
Kevin Nelson
2/2/2017 4:29:37 PM
Written plan required for operations within 50 feet of small fish stream that runs by brick house.
-
Kevin Nelson
2/2/2017 4:28:43 PM
Reviewed by Stewardship Forester K. Nelson 02/02/17. Pre-operation with landowner earlier in winter. Recommend a pre-harvest meeting with ODF prior to operations. Some areas are steep and stream crossings may be necessary.
Notifier Comment