- OPERATION NAME: hergert rd
- SUBMIT DATE: 10-25-2016
- NOAP ID: 2016-531-12330 (c)
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
NOAP CONTINUATIONS
-
Issued on: 12-27-2017Expires on: 12-31-2018Continuation issued by Kevin Nelson
-
Issued on: 01-09-2017Expires on: 12-31-2017Continuation issued by Kevin Nelson
Oregon Department of Forestry Contact Information
ODF OFFICE: FOREST GROVE
Forest Grove, Oregon, 97116
ODF FORESTER
Notifier
NOAP FOREST GROVE
- COMPANY:
- Forest Grove District Kiosk
- ADDRESS:
- 801 Gales Creek Rd
Forest Grove , Oregon, 97116 - PHONE:
- (503) 357-2191
- EMAIL:
- Not Available
Landowner(s)
ETHAN REED
- ADDRESS:
- 3319 Hillside Way
Forest Grove, Oregon, 97116 - PHONE:
- (503) 357-3576
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
ETHAN REED
- ADDRESS:
- 3319 Hillside Way
Forest Grove, Oregon, 97116 - PHONE:
- (503) 357-3576
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Ethan Reed
- PHONE:
- (503) 357-3576
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Ethan Reed
This Unit falls within the following Regulated Use Areas: WV-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Wetlands: Freshwater Pond
- None detected.
Site Conditions
There are no known site conditions associated with this NOAP.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Jasen McCoy
5/14/2019 8:50:16 AM
On site reforestation inspection was completed on 5/8/2019. Several patch cuts (in total approximately 3 acres) throughout the notified area have stocking levels below the FPA requirements. It is recommended to perform site prep and to plant approximately 350 seedlings to the acre in order to get in FPA compliance.
-
Kevin Nelson
12/27/2017 11:10:18 AM
Operations continued into 2018. Begin to replant the portions of unit that were cleared in 2016 by Spring 2018.
-
Kevin Nelson
1/9/2017 11:24:05 AM
Operations continued into 2017.
-
Kevin Nelson
11/17/2016 1:22:19 PM
Stream in unit is non-fish. Pond below unit with stand pipe excludes fish passage.
Notifier Comment