- OPERATION NAME: Siletz 52 Acres
- SUBMIT DATE: 07-31-2015
- NOAP ID: 2015-553-11208
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: TOLEDO
Toledo, Oregon, 97391
ODF FORESTER
Notifier
JARED CHRISTIAN
- COMPANY:
- Christian Properties LLC
- ADDRESS:
- 3205 Montebello Ave
Springfield, Oregon, 97477 - PHONE:
- (541) 999-6977
- EMAIL:
- Not Available
Landowner(s)
RICK CHRISTIAN
- COMPANY:
- Christian Futures Inc
- ADDRESS:
- 3112 Industrial Ave
Springfield, Oregon, 97478 - PHONE:
- (541) 747-2311
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
RICK CHRISTIAN
- COMPANY:
- Christian Futures Inc
- ADDRESS:
- 3112 Industrial Ave
Springfield, Oregon, 97478 - PHONE:
- (541) 999-6977
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Rick Christian
- PHONE:
- (541) 953-3142
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Rick Christian
- COMPANY:
- Future Logging
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
Site Conditions
- Stream within 100 feet of area.
- Slope of steepest 1/3 area: 40 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Joe Hitselberger
8/19/2015 1:48:38 PM
The upper portions of the unknown type streams in the project area were determined type N due to the lack of habitat availability. Stream # "2" and "3" may provide fish habitat near the confluence with Sam's Creek. These streams will be buffered an appropriate distance from the confluence to protect fish habitat.
-
Joe Hitselberger
8/4/2015 11:10:36 AM
Your proposed operation may be located near a cultural and historic site. The Oregon Department of Forestry encourages you to protect cultural and historic sites, an important part of Oregon’s heritage. We recommend you contact the State Historic Preservation Office (SHPO) for help protecting these sites. ODF recommends you contact SHPO to determine if your operation may impact a cultural or historic site and to learn more about your rights and responsibilities. • Contact SHPO, c/o Oregon Heritage, Oregon Parks & Recreation Department, 725 Summer St NE, Suite C, Salem, OR 97301, or phone (503) 986-0674. • Provide either the legal property description and USGS map showing the operation or the processed ODF Notification of Operation and map. For more information see Protecting Cultural and Historic Sites, http://www.oregon.gov/odf/PUBS/docs/Forest_Facts/Protecting_Cultural_and_Historic_Sites.pdf
-
Joe Hitselberger
8/4/2015 11:07:50 AM
15 day waiting period waived outside the RMA of a type F or D stream.
Notifier Comment