• OPERATION NAME: Sheythe Creek Road
  • SUBMIT DATE: 07-08-2024
  • NOAP ID: 2024-552-09498 (c)
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)

NOAP CONTINUATIONS

  • Issued on: 01-03-2025
    Expires on: 12-31-2025
    Continuation issued by Bill Mahr

Oregon Department of Forestry Contact Information

ODF OFFICE: PHILOMATH
ODF DISTRICT:
West Oregon
ADDRESS:
24533 Alsea Hwy
Philomath, Oregon, 97370
PHONE:
(541) 929-3266
ODF FORESTER
NAME:
Bill Mahr

Notifier

BRITT PERKINS
COMPANY:
Hampton Timber, LLC
ADDRESS:
PO 2315
Salem, Oregon, 97308
PHONE:
(503) 365-8400
EMAIL:
Not Available

Notifier Comment

No Notifier comments have been made on this NOAP.

Landowner(s)

Landowner Responsibility
BRITT PERKINS
COMPANY:
Hampton Timber, LLC
ADDRESS:
PO 2315
Salem, Oregon, 97308
PHONE:
(503) 365-8400
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
BRITT PERKINS
COMPANY:
Hampton Timber, LLC
ADDRESS:
PO 2315
Salem, Oregon, 97308
PHONE:
(503) 365-8400
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Spencer Noonen
PHONE:
(503) 383-6151

Units / Activities / Operators

  • Road Construction

    COMPLETION STATUS:
    Completed
    by Britt Perkins reported on 12/18/2025
    METHOD(S):
    Excavator, Dozer
    OPERATOR:
    Robert Warfield
    COMPANY:
    Warfield Limited

This Unit falls within the following Regulated Use Areas: WO-3

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • Sheythe Creek: Medium - Type F Stream
  • Unknown: Small - Type F Stream
  • Sheythe Creek: Medium - Type D Stream
  • Sheythe Creek: Medium - SSBT Stream
300 Feet of
  • None detected.
1768.6 FEET
  • Road Reconstruction

    COMPLETION STATUS:
    Completed
    by Britt Perkins reported on 12/18/2025
    METHOD(S):
    Excavator, Dozer
    OPERATOR:
    Robert Warfield
    COMPANY:
    Warfield Limited

This Unit falls within the following Regulated Use Areas: WO-3

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • Unknown: Small - Type F Stream
300 Feet of
  • None detected.
3124.4 FEET
  • Road Construction

    COMPLETION STATUS:
    Completed
    by Britt Perkins reported on 12/18/2025
    METHOD(S):
    Excavator, Dozer
    OPERATOR:
    Robert Warfield
    COMPANY:
    Warfield Limited

This Unit falls within the following Regulated Use Areas: WO-3

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • Sheythe Creek: Medium - Type F Stream
  • Unknown: Medium - Type F Stream
  • Unknown: Small - Type F Stream
  • Sheythe Creek: Medium - Type D Stream
  • Sheythe Creek: Medium - SSBT Stream
  • Unknown: Medium - SSBT Stream
300 Feet of
  • None detected.

Site Conditions

RESOURCES THAT MAY REQUIRE A WRITTEN PLAN
  • Stream within 100 feet of area.
  • Large wetlands (> 8 acres) within 300 feet of area.
  • Domestic water supply within 300 feet of area.
ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 45 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Dave Thompson
    12/19/2024 10:18:02 AM
    Made a change to Stewardship Forester.
  • Dave Thompson
    12/19/2024 10:17:46 AM
    This NOAP has been Continued into 2025 at the request of the Landowner.
  • Dave Thompson
    7/10/2024 5:03:55 PM
    A Non-Statutory Written Plan is required, and has been submitted with this NOAP, for any road construction or reconstruction activity that will take place near or within a defined Type N stream channel.
  • Dave Thompson
    7/10/2024 5:03:39 PM
    A Statutory Written Plan is required, and has been submitted with this NOAP, for any operational activity that will directly affect the RMA of the Type F / Type D / Type SSBT streams and a Significant Wetland. Stewardship Forester comments may be provided following the 14-day open comment period.