- OPERATION NAME: Crestmont Oak Savannah
- SUBMIT DATE: 04-21-2015
- NOAP ID: 2015-551-06706
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
- Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.
Oregon Department of Forestry Contact Information
ODF OFFICE: PHILOMATH
Philomath, Oregon, 97370
ODF FORESTER
Notifier
ROBIN TUCKER
- COMPANY:
- Tucker Forestry Consulting LLC
- ADDRESS:
- PO Box 339
Lebanon, Oregon, 97355 - PHONE:
- (541) 497-3717
- EMAIL:
- Not Available
Landowner(s)
ED EASTERLING
- COMPANY:
- Crestmont Farm Land Trust
- ADDRESS:
- 5060 Philomath Blvd #504
Corvallis, Oregon, 97333 - PHONE:
- (541) 368-4215
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
ED EASTERLING
- COMPANY:
- Crestmont Farm Land Trust
- ADDRESS:
- 5060 Philomath Blvd #504
Corvallis, Oregon, 97333 - PHONE:
- (541) 368-4215
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Ed Easterling
- PHONE:
- (541) 368-4215
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Ground
- OPERATOR:
- Christopher Henricks
- COMPANY:
- Henricks Enterprises Corp.
-
Treatment of Slash
- METHOD(S):
- Burning - piles
- OPERATOR:
- Ed Easterling
- COMPANY:
- Crestmont Farm Land Trust
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- NS Owl
Site Conditions
- Stream within 100 feet of area.
- Northern Spotted Owl nesting site within half mile of area.
- Slope of steepest 1/3 area: 40 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Bill Mahr
5/22/2015 9:57:43 AM
Crestmont Farm Plan for an alternate practice has been received and attached the notification. The plan for an alternate practice is approved by Bill Mahr 5/22/2015.
-
Bill Mahr
4/29/2015 10:20:36 AM
Fish presence was verified in two streams near the harvest unit. End of fish was also verified on a side trib near unit. Portions of the stream also require a written plan. A plan for Alt practice for removing conifer in the rma is required. First draft was received on 4/29/2015.
-
Bill Mahr
4/29/2015 10:17:32 AM
Unit boundary changes made by B. Mahr 4/29/2015.
-
Bill Mahr
4/23/2015 3:38:20 PM
Site visit occurred 4/23/2015. Plan for alternate practice will be needed to work in the rma. No plan needed for spotted owl site. Waiver granted for operation outside of rma.
-
Bill Mahr
4/21/2015 1:27:10 PM
Additional documents may be needed if operating within 100 feet of the medium stream located in the operation area. Site visit has been scheduled for Thursday April 23rd at 1:00pm. Purpose of site visit will be to determine if stream is fish bearing or not. We will also discuss buffer widths on streams. Northern Spotted owl site is near the operation area. Your distance to the nest site is greater than 1/4 mile and is not line of site. A written plan will not likely be warranted. During site visit we will discuss the need for a written plan.
Notifier Comment