- OPERATION NAME: 500308 Pankey Pit W3450
- SUBMIT DATE: 09-21-2023
- NOAP ID: 2023-553-10589
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: TOLEDO
Toledo, Oregon, 97391
ODF FORESTER
Notifier
ALSEA WEYERHAEUSER
- COMPANY:
- Weyerhaeuser
- ADDRESS:
- PO Box 2260
Corvallis, Oregon, 97339 - PHONE:
- (541) 988-7515
- EMAIL:
- Not Available
Landowner(s)
WTHI ALSEA
- COMPANY:
- Weyerhaeuser Timber Holdings, Inc
- ADDRESS:
- P.O. Box 2260
Corvallis, Oregon, 97339 - PHONE:
- (541) 988-7535
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
WYNR ALSEA
- COMPANY:
- Weyerhaeuser NR
- ADDRESS:
- P.O. Box 2260
Corvallis, Oregon, 97339 - PHONE:
- (541) 988-7535
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Weyerhaeuser Fire Plan
- PHONE:
- (541) 243-7912
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- WYNR Alsea
- COMPANY:
- Weyerhaeuser NR
-
Treatment of Slash
- METHOD(S):
- Manual, Mechanical
- OPERATOR:
- WYNR Alsea
- COMPANY:
- Weyerhaeuser NR
This Unit falls within the following Regulated Use Areas: WO-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- South Fork Weist Creek: Small - Type F Stream
- Unknown: Small - Type F Stream
- Weist Creek: Medium - Type F Stream
- Weist Creek: Small - Type F Stream
- Weist Creek: Medium - SSBT Stream
- None detected.
Site Conditions
- Stream within 100 feet of area.
- Seep or spring within 100 feet of area.
- Slope of steepest 1/3 area: 80 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Rieghly Sitton
10/4/2023 2:23:16 PM
The Plan for Alternate Practice dated 10/4/2023 is approved. Fully implementing this Plan for an Alternate Practice will likely achieve the FPA resource protection standards. The operation will be evaluated on the basis of how well this approved Plan for an Alternate Practice is implemented and how well required resource protection is achieved.
Notifier Comment