- OPERATION NAME: Siletz River Site Prep Ground
- SUBMIT DATE: 06-28-2023
- NOAP ID: 2023-552-07994
- LINCOLN: 2023-552-07994-1
- POLK: 2023-552-07994-2
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
Oregon Department of Forestry Contact Information
ODF OFFICE: DALLAS
Dallas, Oregon, 97338
STEWARDSHIP FORESTER
Notifier
MFM CORVALLIS SILVICULTURE
- COMPANY:
- Manulife Investment Management - Forest Management
- ADDRESS:
- 2851 NW 9th St. Ste. E
Corvallis, Oregon, 97330 - PHONE:
- (503) 838-1610
- EMAIL:
- Not Available
Landowner(s)
HANCOCK TIMBERLAND XI,INC. C/O MFM CORVALLIS
- COMPANY:
- Hancock Timberland XI,Inc.
- ADDRESS:
- 2851 NW 9th St. Ste. E
Corvallis, Oregon, 97330 - PHONE:
- (503) 838-1610
The Landowner is responsible for reforestation. Early consultation with the Stewardship Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Fire Emergency Contact
- NAME:
- Manulife Investment Management Forest Management
- PHONE:
- (503) 838-1610
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the Stewardship Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your Stewardship Forester for more information.
Units / Activities / Operators
WARNING!
Pesticide users must follow all pesticide product label requirements, including any that prohibit applications near or into streams or other water bodies! Pesticide users must be sure the label that comes with the pesticide product allows the planned use!
Contact the Oregon Department of Agriculture here or at 503-986-4635 for information on allowed uses of pesticide products.
-
Herbicide Application (Unit)
- METHOD(S):
- Ground - Pressurized / Broadcast
- OPERATOR:
- Nick Domes
- COMPANY:
- Nick's Timber Services Inc
- CHEMICALS:
- glyphosate, imazapyr, indaziflam, metsulfuron methyl
- CARRIERS:
- water
- ADDITIVES:
- Crosshair, MSO-100, MSO Premium, MSO Concentrate with Leci-Tech, MSO Concentrate
This Unit falls within the following Regulated Use Areas: WO-2
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- Unknown: - Type F Stream
- Unknown: - Type F Stream
- Unknown: - Type D Stream
- None detected.
-
Herbicide Application (Unit)
- METHOD(S):
- Ground - Pressurized / Broadcast
- OPERATOR:
- Nick Domes
- COMPANY:
- Nick's Timber Services Inc
- CHEMICALS:
- glyphosate, imazapyr, indaziflam, metsulfuron methyl
- CARRIERS:
- water
- ADDITIVES:
- Crosshair, MSO-100, MSO Premium, MSO Concentrate with Leci-Tech, MSO Concentrate
This Unit falls within the following Regulated Use Areas: WO-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- Wetlands: Freshwater Emergent Wetland, Freshwater Forested/Shrub Wetland
- None detected.
Site Conditions
- Stream within 100 feet of area.
- Seep or spring within 100 feet of area.
- Small wetlands (<= 8 acres) within 300 feet of area.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Dave Thompson
7/13/2023 4:40:17 PM
After reviewing your Statutory Written Plan, I offer you the following comments: Fully implementing this written plan is likely to achieve the resource protection standards. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
-
Dave Thompson
6/28/2023 3:12:45 PM
A Statutory Written Plan is required, and has been submitted with this NOAP, for any operational activity that will directly affect the RMA of the Type F / Type D streams. Stewardship Forester comments may be provided following the 14-day open comment period.
Notifier Comment