- OPERATION NAME: Brunnell-Kronsteiner LRT Rd Construction
- SUBMIT DATE: 03-28-2023
- NOAP ID: 2023-740-04019
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
Oregon Department of Forestry Contact Information
ODF OFFICE: COOS BAY
Coos Bay, Oregon, 97420
ODF FORESTER
Notifier
LONE ROCK TT LANDCO., LLC
- COMPANY:
- Lone Rock TT Landco., LLC
- ADDRESS:
- PO Box 1127
Roseburg, Oregon, 97470 - PHONE:
- (541) 673-0141
- EMAIL:
- Not Available
Landowner(s)
LONE ROCK TT LANDCO., LLC
- COMPANY:
- Lone Rock TT Landco., LLC
- ADDRESS:
- PO Box 1127
Roseburg, Oregon, 97470 - PHONE:
- (541) 673-0141
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
LONE ROCK TT LOGCO., LLC
- COMPANY:
- Lone Rock TT Logco, LLC
- ADDRESS:
- PO Box 1127
Roseburg, Oregon, 97470 - PHONE:
- (541) 673-0141
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Tyler Nay
- PHONE:
- (541) 673-0141
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Road Construction
- METHOD(S):
- Excavator, Dozer
- OPERATOR:
- Lone Rock Logging Company, LLC
- COMPANY:
- Lone Rock Logging, LLC
This Unit falls within the following Regulated Use Areas: CS-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- Osprey
-
Road Reconstruction
- METHOD(S):
- Excavator, Dozer
- OPERATOR:
- Lone Rock Logging Company, LLC
- COMPANY:
- Lone Rock Logging, LLC
This Unit falls within the following Regulated Use Areas: CS-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- Osprey
Site Conditions
- Bald Eagle nesting site within half mile of area.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Jon Laine
8/14/2023 5:53:26 PM
The written plan has been reviewed. Fully implementing this written plan is likely to achieve compliance with resource protection standards in the forest practice rules/law that it addresses. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
-
Jon Laine
7/27/2023 2:40:50 PM
The required Statutory Written Plan was received on 7/19/2023. The comment period is in effect.
-
Jon Laine
4/5/2023 5:36:47 PM
Resource review complete. Per OAR 629-625-0100(3) a Non-Statutory written plan is required prior to road construction on High Landslide Hazard Locations.
Notifier Comment