- OPERATION NAME: LNC 71
- SUBMIT DATE: 09-28-2022
- NOAP ID: 2022-740-11246 (c)
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
NOAP CONTINUATIONS
-
Issued on: 12-28-2022Expires on: 12-31-2023Continuation issued by Torin Miller
Oregon Department of Forestry Contact Information
ODF OFFICE: COOS BAY
Coos Bay, Oregon, 97420
ODF FORESTER
Notifier
PAT FADDEN
- COMPANY:
- South Coast Lumber
- ADDRESS:
- PO Box 670
Brookings, Oregon, 97415 - PHONE:
- (541) 469-3898
- EMAIL:
- Not Available
Landowner(s)
PATRICK FADDEN
- COMPANY:
- Chetco Resources, LLC
- ADDRESS:
- PO Box 670
Brookings, Oregon, 97415 - PHONE:
- (541) 469-3898
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
PATRICK FADDEN
- COMPANY:
- Chetco Resources, LLC
- ADDRESS:
- PO Box 670
Brookings, Oregon, 97415 - PHONE:
- (541) 469-3898
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Pat Fadden
- PHONE:
- (541) 469-3898
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- Pat Fadden
- COMPANY:
- South Coast Lumber
This Unit falls within the following Regulated Use Areas: CS-5
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- Unknown: - Type F Stream
- None detected.
Site Conditions
- Stream within 100 feet of area.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
-
Casara Nichols
10/28/2022 7:49:51 AM
Written plan has been reviewed. Fully implementing this written plan is likely to achieve compliance with resource protection standards in the forest practice rules/law that it addresses. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
-
Randy Wiese
10/5/2022 10:52:03 AM
The harvest area notified is within the area regulated for Sudden Oak Death (SOD) as per OAR 603-052-1230. As of the date of this comment, the area notified is within the Generally Infested Area and portions of the area are within 300 feet of the nearest known SOD infestation. A proximity map has been uploaded to show where the notification is in relation to infected locations. Please see the attached guide for information on harvesting within the Quarantine Area and contact Randy Wiese, ODF SOD Program, at randall.s.wiese@odf.oregon.gov (541) 294-8425 for any questions or further information on the areas affected by the quarantine restrictions.
-
Casara Nichols
9/30/2022 9:58:44 AM
Written plan received with notification on 09/28/2022. Comment period is in effect.
-
Casara Nichols
9/30/2022 9:54:56 AM
A statutory written plan is required for operations within 100' of North Fork Chetco - T: Medium - Type F Stream and North Fork Chetco - T: Small - Type F Stream.
Notifier Comment