• OPERATION NAME: C1675 Rd 3252
  • SUBMIT DATE: 05-17-2021
  • NOAP ID: 2021-740-06227 (c)
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)

NOAP CONTINUATIONS

  • Issued on: 12-16-2021
    Expires on: 12-31-2022
    Continuation issued by Alicia Nukusuk

Oregon Department of Forestry Contact Information

ODF OFFICE: COOS BAY
ODF DISTRICT:
Western Lane
ADDRESS:
63612 Fifth Road
Coos Bay, Oregon, 97420
PHONE:
(541) 267-4136
ODF FORESTER
NAME:
Jennifer Ward

Notifier

WEYERHAEUSER COOS BAY
COMPANY:
Weyerhaeuser
ADDRESS:
63459 Olive Barber Road
Coos Bay, Oregon, 97420
PHONE:
(541) 267-1850
EMAIL:
Not Available

Notifier Comment

A field visit may be needed to address the fresh water pond that is considered a resource to be protected.

Landowner(s)

Landowner Responsibility
WY COOS BAY
COMPANY:
Weyerhaeuser Company
ADDRESS:
63459 Olive Barber Rd
Coos Bay, Oregon, 97420
PHONE:
(541) 269-5540
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
WYNR COOS BAY
COMPANY:
Weyerhaeuser NR
ADDRESS:
63459 Olive Barber Rd
Coos Bay, Oregon, 97420
PHONE:
(541) 269-5540
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Bobby Watkins
PHONE:
(541) 267-1868

Units / Activities / Operators

76.3 ACRES
  • Clearcut/Overstory Removal

    METHOD(S):
    Cable, Ground
    OPERATOR:
    WY Coos Bay
    COMPANY:
    Weyerhaeuser Company
  • Felling Harvest Unit (No yarding/decking)

    METHOD(S):
    Manual, Mechanical
    OPERATOR:
    LBA Contract Cutting
    COMPANY:
    LBA

This Unit falls within the following Regulated Use Areas: CS-2

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • Unknown: - Type F Stream
  • Wetlands: Freshwater Pond
300 Feet of
  • None detected.

Site Conditions

RESOURCES THAT MAY REQUIRE A WRITTEN PLAN
  • Stream within 100 feet of area.
ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 70 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Jennifer Ward
    6/7/2021 9:34:31 AM
    Written plan has been reviewed. Fully implementing this written plan is likely to achieve compliance with resource protection standards in the forest practice rules/law that it addresses. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
  • Jennifer Ward
    5/25/2021 1:56:47 PM
    Please be aware there may be a wetland/pond that is less than an acre but greater than a quarter of an acre located on the southern unit boundary where it intersects with Lake Creek-T. Protection measures require leaving snags and down wood and protecting soil from disturbance in wetland areas greater than 1/4 acre but less than than 8 acres. See OAR 629-655-0000 for details.
  • Jennifer Ward
    5/25/2021 1:55:08 PM
    Required Statutory Written Plan was received on 5/17/2021; comment period is in effect.