• OPERATION NAME: Birdbrain
  • SUBMIT DATE: 06-04-2020
  • NOAP ID: 2020-553-06703
  • LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
  • Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
  • Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
  • Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
  • Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.

Oregon Department of Forestry Contact Information

ODF OFFICE: TOLEDO
ODF DISTRICT:
West Oregon
ADDRESS:
763 NW Forestry Rd
Toledo, Oregon, 97391
PHONE:
(541) 336-2273
ODF FORESTER
NAME:
Leo Williamson

Notifier

JAYME DUMFORD
COMPANY:
Thompson Timber Co.
ADDRESS:
6860 S.W. Winding Way
Corvallis, Oregon, 97330
PHONE:
(541) 929-6849
EMAIL:
Not Available

Notifier Comment

No Notifier comments have been made on this NOAP.

Landowner(s)

Landowner Responsibility
ERIC THOMPSON
COMPANY:
Thompson Tree Farm, Inc
ADDRESS:
6860 SW Winding Way
Corvallis, Oregon, 97333
PHONE:
(541) 929-6849
Landowner Responsibility

The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.

On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.

For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)

Timber Owner

Timber Owner Responsibility
ERIC THOMPSON
COMPANY:
Thompson Tree Farm, Inc
ADDRESS:
6860 SW Winding Way
Corvallis, Oregon, 97333
PHONE:
(541) 929-6849
Timber Owner Responsibility

If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.

Fire Emergency Contact

NAME:
Jayme Dumford
PHONE:
(541) 740-3655

Units / Activities / Operators

WARNING!

Pesticide users must follow all pesticide product label requirements, including any that prohibit applications near or into streams or other water bodies! Pesticide users must be sure the label that comes with the pesticide product allows the planned use!

Contact the Oregon Department of Agriculture here or at 503-986-4635 for information on allowed uses of pesticide products.

38.2 ACRES
  • Clearcut/Overstory Removal

    METHOD(S):
    Cable, Ground
    OPERATOR:
    Jayme Dumford
    COMPANY:
    Thompson Timber Co.
  • Herbicide Application (Unit)

    METHOD(S):
    Aerial, Ground - Pressurized / Broadcast
    OPERATOR:
    Jayme Dumford
    COMPANY:
    Thompson Timber Co.
    CHEMICALS:
    glyphosate, triclopyr with acid, sulfometuron methyl & metsulfuron methyl, imazapyr
    CARRIERS:
    water
    ADDITIVES:
    Dyne-Amic, No Foam
  • Treatment of Slash

    METHOD(S):
    Mechanical, Burning - piles
    OPERATOR:
    Jayme Dumford
    COMPANY:
    Thompson Timber Co.

This Unit falls within the following Regulated Use Areas: WO-2

A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:

100 Feet of
  • Unknown: - Type F Stream
300 Feet of
  • None detected.

Site Conditions

RESOURCES THAT MAY REQUIRE A WRITTEN PLAN
  • Stream within 100 feet of area.
ADDITIONAL REGULATIONS MAY APPLY
  • Slope of steepest 1/3 area: 65 %.

Uploaded Documents

You must be signed in as a registered user with FERNS to see documents associated with this NOAP.

Formal Comments

COMMENTS
  • Leo Williamson
    6/24/2020 3:54:25 PM
    After reviewing your Statutory Written Plan, I offer you the following comments: Fully implementing this written plan is likely to achieve the resource protection standards. This operation will be evaluated on the basis of how well required practices are applied and how well required resource protection is achieved.
  • Leo Williamson
    6/10/2020 10:20:33 AM
    A written plan is required, and has been submitted for operations within 100’ of the identified protected resources. Stewardship Forester comments may be provided following the 14 day waiting period