- OPERATION NAME: 272019 Powell Cr G0249
- SUBMIT DATE: 06-03-2020
- NOAP ID: 2020-771-06623 (c)
- LANDOWNER STATUS: The Landowner is not a Small Forestland Owner.
- Apply for a permit to use fire or power-driven machinery (PDM) (ORS 477.625)
- Notify for an operation (excludes applying pesticides by helicopter) (ORS 527.670)
- Notify the Departments of Forestry and Revenue of my intent to harvest timber (ORS 321.550)
- Before you use fire, contact the local office of the Oregon Department of Forestry or Forest Protective Association to see if additional burn permit and/or Smoke Management Program regulations apply.
NOAP CONTINUATIONS
-
Issued on: 01-20-2021Expires on: 12-31-2021Continuation issued by Renae Meyer
Oregon Department of Forestry Contact Information
ODF OFFICE: SPRINGFIELD
Springfield, Oregon, 97478
ODF FORESTER
Notifier
STEVE SWANSON
- ADDRESS:
- Eugene, Oregon
- PHONE:
- Not Available
- EMAIL:
- Not Available
Landowner(s)
WY SOUTH VALLEY
- COMPANY:
- Weyerhaeuser Company
- ADDRESS:
- P.O. Box 1819
Eugene, Oregon, 97440 - PHONE:
- (541) 744-4600
The Landowner is responsible for reforestation. Early consultation with the ODF Forester is advised.
On-site inspections may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protection and forest practices on private land.
For activities or operations changing the land to a non-forest use, the applicant is advised to contact the appropriate local government regarding land use regulations which may apply to the future use or development of this site.)
Timber Owner
WYNR SOUTH VALLEY
- COMPANY:
- Weyerhaeuser NR
- ADDRESS:
- 5000 Franklin Blvd.
Eugene, Oregon, 97403 - PHONE:
- (541) 744-4600
If timber harvesting is part of the proposed operation, the party shown below, owning the timber at the point it is first measured, is responsible for payment of Oregon timber taxes.
Fire Emergency Contact
- NAME:
- Steve Swanson
- PHONE:
- (541) 744-4600
Legal Notice
WRITTEN PLANS
A Written Plan (in addition to this NOAP) is required before operation activities can begin near the protected resources listed with the Unit information or Site Conditions below or otherwise described to you by the ODF Forester (OAR 629-605-0170(2), (3), and (5)). The Written Plan must describe in detail how the resource(s) will be protected during the operation. There is a waiting period for Written Plans that is separate from the notification waiting period. Contact your ODF Forester for more information.
Units / Activities / Operators
-
Clearcut/Overstory Removal
- METHOD(S):
- Cable, Ground
- OPERATOR:
- WY South Valley
- COMPANY:
- Weyerhaeuser Company
-
Treatment of Slash
- METHOD(S):
- Mechanical, Burning - piles
- OPERATOR:
- WY South Valley
- COMPANY:
- Weyerhaeuser Company
This Unit falls within the following Regulated Use Areas: EL-1
A Statutory Written Plan is required for the resources detected in or near this Unit if activities occur within:
- No streams or wetlands detected.
- NS Owl
Site Conditions
- Stream within 100 feet of area.
- Slope of steepest 1/3 area: 70 %.
Uploaded Documents
You must be signed in as a registered user with FERNS to see documents associated with this NOAP.
Formal Comments
No formal comments have been made on this NOAP.
Notifier Comment